A steam room places constant moisture on every internal surface.
Before work starts
The room needs a sealed background and a floor drain.
Technical work
Generator size depends on room volume and surface materials.
Equipment and access
Penetrations around lights and controls need separate sealing.
Testing and handover
Steam distribution and drainage are tested at handover.
